⚖️ Case Study: Dakschinanchal Vidyut Vitrán Nigam Ltd. v. Vidut Lokpal, U.P. & Ors. (Civil Appeal No. 5099 of 2013, decided on 10.09.2026)
📌 Factual Background
- Respondent No. 3 applied for a 4000 KVA electricity connection in 1997.
- Due to supply constraints, only 2000 KVA was sanctioned.
- In 1998, the appellant offered the balance 2000 KVA, but the consumer declined.
- Nearly a decade later, in 2007, the appellant raised a demand of ₹57,74,164/- as Minimum Consumption Guarantee Charges (MCGC) for the unaccepted additional load.
⚖️ Legal Issues
- Whether the demand raised in 2007 for the 1998 period was barred by limitation under Section 56(2) of the Electricity Act, 2003.
- Whether Clauses 8.1 & 8.2 of the UPERC Regulations, 2007 allowing licensee representation before Ombudsman were ultra vires Section 42(6) of the Act.
📝 Contentions
- Appellant (Distribution Licensee): Claimed liability for MCGC as the consumer refused additional load despite readiness to supply.
- Respondent (Consumer): Argued no consent was given, no additional load was released, and the demand was time‑barred.
📚 Case Laws Discussed
- K.C. Ninan v. Kerala State Electricity Board & Ors. (2023 INSC 560) – on scope of Ombudsman regulations.
- Assistant Engineer (D1), Ajmer Vidyut Vitran Nigam Ltd. v. Rahamatullah Khan alias Rahamjulla (2020) 4 SCC 650 – clarified that liability arises only when a bill is issued, and limitation under Section 56(2) applies from when charges become “first due.”
👩⚖️ Observations of SC
- Liability arises only when electricity is consumed and billed.
- The demand raised in 2007 for 1998 was barred by limitation under Section 56(2) and even under the Limitation Act, 1963.
- Consumer’s liability arises only when additional load is actually released, which never happened.
- Clauses 8.1 & 8.2 of UPERC Regulations were ultra vires Section 42(6) as only consumers can approach the Ombudsman.
✅ Conclusion
The Supreme Court dismissed the appeal, holding that the 2007 demand was illegal and unenforceable.
🔑 Key Takeaways
- Limitation matters: Electricity dues must be raised within statutory timelines.
- Consent & supply are essential: Liability arises only when load is released and accepted.
- Regulatory consistency: Ombudsman jurisdiction is consumer‑centric; licensees cannot invoke it.